Promon Engenharia’s project portfolio features such high-profile projects as the Itaipu hydroelectric plant (on the Brazil/Paraguay border), the Angra Nuclear Power Plant (Rio de Janeiro), and numerous oil & gas projects across Brazil. Working with multiple partners, it was critical for Promon to deliver instrumentation data in a consistent, clear and easy-to-understand manner.
By implementing digital twin technologies based on AVEVA™ Unified Engineering and AVEVA™ Process Simulation, they reduced engineering hours by 15% and implemented projects 60% faster.
“AVEVA Instrumentation enables our engineers to focus uniquely on detailed and accurate project work. They don’t have to divert their attention to seek administrator input when they require interoperability; every process moves faster, more simply and more productively.”
– Siddartha Nassif; System Engineer Coordinator, Promon Engenharia
Goals
- To eliminate downtime triggered by systems realignment with other parties’ technologies.
- To seamlessly fulfill Promon’s role for every project, regardless of size or complexity.
- To produce higher-quality designs.
Challenges
- Systems did not integrate with other parties’ technology.
- Designers could not be self-sufficient with the current technology.
Results
- Instrumentation data is delivered in a clear, consistent and easily understandable manner.
- Uniform export of data provides complete interoperability.
- Maximum workflow flexibility has improved project productivity and design accuracy is now collaborative.